Production Equipment
WanFu Insulation is equipped with production and inspection facilities for polyurethane insulation products and project-based piping systems.


Production Process for Polyurethane Pipe Shells
Raw material preparation
Mold preparation
Mold preparation
Curing
Cutting and trimming
Surface facing
Dimensional inspection
Packaging
Production Process for Polyurethane Pipe Supports
Drawing confirmation
Insulation block production
Metal part fabrication
Anti-corrosion treatment
Assembly
Load and dimensional inspection
Packaging


Production Process for Pre-insulated Polyurethane Pipes
Working pipe preparation
Steel pipe shot blasting
Outer jacket production
Pipe threading
PU foaming
End trimming
Dimensional inspection
Anti-corrosion inspection
Packaging
Quality Control
Check raw materials before production to ensure stable product performance.
Check density, closed-cell structure, foaming uniformity, and surface quality.
For pipe supports, check compressive strength and project load requirements.
For pre-insulated pipes and steel components, check coating thickness and anti-corrosion quality.
Prepare inspection records, photos, packing list, and shipment documents before delivery.
Check density, closed-cell structure, foaming uniformity, and surface quality.

Packaging & Delivery
WanFu provides packaging support according to product type, quantity, shipment method, and destination country.

For Polyurethane Pipe Shells
Moisture-proof film, cartons, woven bags, pallets, compression-resistant packaging, and size labels can be used.

For Pipe Supports
Protective packaging helps reduce impact, moisture, metal part scratches, and surface damage during transportation.

For Pre-insulated Pipes:
Long pipes are loaded with proper spacing, support, and fixing to reduce movement and damage during transportation.

For Spray Foam Machines:
Machines can be packed with reinforced wooden cases to protect electrical systems, spray guns, hoses, and precision components.




